Vinyl Liner Pool Construction

Step 1: The hole is dug two foot larger than the pool size which provides a flat surface to install the wall panels.


Step 2: The wall panels are set place.


Step 3: Concrete is poured around the base of the wall panels, the pool is plumbed, & then the pool is backfilled.


Step 4: A sand and cement bottom is installed.


Step 5: The liner is installed.


Step 6: The concrete is formed & reinforced with steel.


Step 7: The concrete decking is poured.  After curing, the deck equipment is installed, the pool is cleaned, chemicals are added & the pool is ready to use.